A lot can happen in a year.  We’ve been busy building and installing new roasters and rebuilding older 23R models.

The new  Burns roaster shown in the photo below was built and shipped in less than 4 weeks. This timetable is terrific for anyone wanting to upgrade to a new system without sacrificing production schedules.

Rebuilding older 23R models have also become quite popular.  The components in the picture on the right are from an existing roaster.  These parts will be replaced, painted, and installed in a client’s existing roasting system.  If you are looking to rebuild your  Burns roaster, give us a call.

Leave a Reply